Guide
Waste carrier permit: what replaces registration in England
Updated
The registration system on this site is the one in force. A replacement has been announced for England, with no go-live date published. Here is what has actually been decided.
Question 1
What do you need to check?
Whether your own business has to register, or whether a carrier you are about to pay is registered. They are two different checks.
Email me this result
We will send you these figures and a link back to them. One email, nothing else unless you tick the box.
What is in force today
Registration, upper tier and lower tier, exactly as the checker describes. Nothing on this page has changed the fees, the tiers or the duty to register. Treat everything below as planned, not current.
What Defra has announced
Defra's policy paper Reforming the waste carrier, broker and dealer system, published 22 August 2025, applies to England (gov.uk). It plans to change "from a registration to a permit-based system", with "enhanced background checks" and "a technical competence requirement".
- New words. Carriers, brokers and dealers become waste transporters and waste controllers, with a combined controller-transporter category for skip companies, waste collection companies and waste sites.
- Three permit types under standard rules environmental permits, tiered by scale and by the type and volume of waste, across four levels of risk.
- Registered exemptions for lower-risk activity, re-registered every 3 years. Farmers transporting their own agricultural waste, and extractive waste from mines and quarries, are named as exemption cases.
- Technical competence for the permit holder and nominated persons, by individual assessment or a workplace route, with an anticipated model similar to the CIWM (WAMITAB) system used for site permits.
- Three-year permits paid up front as an application fee plus a subsistence element, with chargeable renewals every 3 years.
When
The policy paper does not publish a go-live date. It describes the transition instead:
- once the new system is live, upper tier holders apply for the relevant permit when their registration falls due for renewal, staggering the change over 3 years;
- lower tier holders, whose registration never expires, must apply for a permit or register an exemption within 12 months of go-live, after which the lower tier registration ceases to exist;
- new applicants go straight to the new system.
Charges will be set out in an impact assessment published alongside the legislation, and the Environment Agency will consult separately on standard rules and charges.
The change that is dated: digital waste tracking
Mandatory digital waste tracking is the part with dates. It has applied to permitted sites receiving waste in England and Wales since 1 October 2026. Defra's policy paper puts Scotland and Northern Ireland at January 2027.
Phase 2, built for waste collectors (carriers, brokers and dealers), is planned as mandatory from October 2027 (gov.uk, updated 1 October 2026). What it means for carriers today is on digital waste tracking for carriers and brokers.
Defra's paper puts the current population at roughly 300,000 registered waste carriers, brokers and dealers, 150,000 registered waste exemption holders and 12,000 waste site operators. That is the scale of the change, and it is why the transition is staggered rather than switched.